Deep Utilities Installation

2005/06/07 BEARSPAW WATER TREATMENT PLANT UPGRADES
Retrofit large diameter piping into new processes.
Value: $ 10,000,000

2006 EAST SHEPARD PHASE 2
Industrial subdivision, sewer and water
Value: $ 3,200,000

2006 EAST LAKE PHASE 3
Industrial subdivision sewer and water.
Value: $ 2,400,000

2006 BANFF TUNNEL MTN FEEDER MAIN
Replace old iron reservoir feeders.
Value: $ 1,400,000

2006 NW COSTCO
Installation of site services.
Value: $ 1,100,000

2005/06 LINCOLN PARK / GARRISON GREEN PHASES 1, 2, 3, 4 & OFFSITES
Installation of storm, sanitary, water mains and residential services.
Value: $ 4,000,000

2005/06 EAST ROCKY VIEW REGIONAL WASTEWATER TRANSMISSION MAIN
Installation of 16 km of 600mm diameter PVC transmission main.
Value: $ 7,000,000

2005 SHERWOOD PHASES 1, 2, 3
Installation of storm, sanitary, water mains and residential services.
Value: $ 3,000,000

2001 NOSE CREEK PHASE V
3800 Linear meter installation of 1350mm polyethylene-line concrete sewer pipe, and construction and installation of new co-generation power station pipeworks
Value: $ 5,500,000

2001 DUFFERIN INDUSTRIAL BUSINESS PARK
Installation of water and sewer services
Value: $1,100,000

2000 DEERFOOT TRAIL FEEDERMAIN
Phases 1, 3, 4, 5, 6, 7
5500 Linear meter construction and installation of 1050mm reinforced concrete high-pressure watermain
Value: $ 3,000,000

2000 DEERFOOT TRAIL & HIGHWAY 22 INTERCHANGE
New construction of highway interchange and stormwater management system including 4000 meters of drain lines and a storm dry-pond
Value: $ 7,000,000
 

Horizontal Augering

BANFF RAW WATER SUPPLY LINE
36” (900m) augered crossings
Trans Canada Highway, 80m length
CPR Crossing, 30m length
Creek and CPR crossing, 90m length

ANDERSON & MACLEOD TRAIL INTERCHANGE
900mm augered from boulevard direct to M/H
2-500mm augered from boulevard direct to M/H
No disturbance of Macleod Trail pavement

SPRING GARDENS SNOW DUMP
(at 32nd Avenue N.E.)
500mm casing augered under R/R, stream bed into #1 fairway of Fox Hollow Golf Course, directly into 5 x 7 storm drain
No disturbance to environment or fairway

HIGHWAY 8 & 85 STREET S.W.
85m of 900mm casing drilled through solid bedrock

WATER INTAKE TO PUMP STATION
(Cavalier Power Station)
85m of 500mm casing augered from inside casement sunk 14m deep BALZAC WATER LINK (Nexen Co. Gen. Plant)
137.5m of 1370mm casing across Deerfoot Trail & Barlow Trail

DEERFOOT FEEDERMAIN
47m of 1200mm casing in solid bedrock across Deerfoot Trail

BALZAC GAS PLANT
Seven 400mm casings augered under H/P Gas Line and utilities

98th AVENUE SANITARY SEWER
(City of Calgary)
900mm diameter casing that was 45m long, 9m deep, in rock and direct to a 1-S manhole
 

Earth Works

2007/08 - Highway 1 And 9
INTERCHANGE

Construction of abutments, ramps with associated service roads including wetland construction and culverts. Total excavation of 1,800,000 m3.
Value: $16,000,000

2007/08 - Policeman Flats Restoration
RESTORATION AFTER 2005 FLOODS
 

Construction of vegetated gabion basket infiltration gallery along the bow with riprap protection berm, access road parking area, CSP and boat launch.
Value: $1,900,000

2007 - Highway 519
HIGHWAY 519 WEST OF INTERSECTION WITH HIGHWAY 23

Grade widening, base paving of 8.7 km of highway 519 including CSP installation and fencing installation.
Value: $5,800,000

2007 - Highway 8 and 22
ROUND ABOUT

Construction of a traffic circle at the intersection of highway 8 and 22 including culverts and future expansion ramps.
Value: $1,900,000

2007 - Town of Three Hills
LAGOON UPGRADES

Construction of 800, 000 m3 sewage lagoon with: 800 m of sewer line with control and over flow manholes, access roads, culverts and swale. Included the excavation of 650,000 m3.
Value: $5,500,000
 

2006/07 - Shepard Storm Water Diversion
DIVERSION PHASE 5A & 5B

Construction of 9.5km stretch of new canal including: excavation of 1,300,000 m3, placement of armour/riprap gravels, installation of 3 twin multiplate structures (3300*5000mm), two twine 3000mm road crossing structures, access roads and associated structures.
Value: $14,100,000
 

2006/07 - Shepard Storm Water Diversion
DIVERSION PHASE 1
 
Construction of headwork structures for the diversion of storm water including: check structure in the existing main canal, wasteway structure to the new Shepard Canal, twin duct underdrain (1800*2400mm) and associated inlet/outlet structure. Included the excavation of 40,000m3.
Value $ 7,400,000
 

2006/07 - Shepard Storm Water Diversion
DIVERSION PHASE 2A

Construction of 2.9km of new canal including: the excavation of 400,000m3, armour gravels, access roads and associated structures.
Value $ 3,200,000
 

2006 - Highway 22
Construction for widening of 9.0km of the existing Highway 22, which included 320,000m3 of excavation.
Value $2,400,000


2006 - City of Lethbridge
REGIONAL LANDFILL EXPANSION

Expansion of municipal landfill including the installation of a clay liner with leachate collection and associated accesses.
Value $ 1,400,000

2005/06 W.I.D. SECONDARY A CANAL REHABILITATION
(Langdon Reservior to 12 Mile Spillway)
Rehabilitation of 4.9 km of existing irrigation canal
Rehabilitation of 4 road crossings
Installation of drain inlet structures
Installation of cast-in-place concrete spillway structure
Value: $2,700,000

2005 HWY 791 GRADE WIDENING
(S. of Hwy 575 to N. of Hwy 581)
Widening of 14.6 km of existing highway
400,000 m3 of common excavation
Superstructure rehabilitation of an existing bridge over the Rosebud River
Value: $3,900,000

2005 STONEY TRAIL DETOURS
Construction of Crowchild Trail detour including paving & streetlighting
Construction of Barlow Trail detour
Construction of abutment fills at Nose Creek and Deerfoot Trail
700,000 m3 of earth work
Value: $5,700,000

2005 HORIZON LANDFILL
(Fort McMurray, Alberta)
Construction of a 35,000 m2 Class 2 landfill including clay liner and drainage media
220,000 m3 of grading
Construction of associated roadways, leachate collection systems, fencing and landscaping
Value: $2,700,000

2002 PIER D APRON EXPANSION
(Calgary International Airport)
Grading construction of storm pond and installation of 1050mm diameter storm sewer
Taxiway earthwork including gravel installation
Installation of subdrain system and electrical ducts
Construction of clean water system
Value: $4,900,000

2001 COUNTRY HILLS BOULEVARD INTERCHANGE
(at Deerfoot Trail)
Construction of boulevard twinning, new ramps and 2 loops
220,000 m3 of common excavation
Included paving and installation of concrete curb, gutter & barrier
Construction of 2 precast retaining walls
Value $ 5,000,000

2001 DEERFOOT TRAIL EXTENSION
(south of Dunbow Rd. to south of Bow River)
Construction of 3.0 km of 4 lane divided highway subgrade
2.5 million m3 of common excavation Installed 4.5 km of perforated subdrain and 1.67 km of storm drainage system
Installed 2 multiplate structures
Value: $7,800,000

2000 DEERFOOT TRAIL & 22X TWINNING
Construction of 3 km of highway twinning, including GBC and asphalt
660,000 m3 of common excavation
Construction of 2.5 km of large diameter storm sewer mains
Horizontal augering
Installation of street lighting and landscaping
Value $ 7,000,000

2000 ST. MARY'S DAM SPILLWAY REPLACEMENT
Earthwork quantities of 870,000 m 3 (rock excavation & blasting)
Construction of 4.0 km of secondary highway
Construction of St. Mary Dam Demolition and removal of bridge and spillway
Curtain grouting and shotcrete installation
Value $ 5,250,000