BANFF
RAW WATER SUPPLY LINE
36” (900m) augered crossings
Trans Canada Highway, 80m length
CPR Crossing, 70m length
Creek and CPR crossing, 90m length
ANDERSON
& MACLEOD TRAIL INTERCHANGE
900mm augered from boulevard direct to M/H
2-500mm augered from boulevard direct to M/H
No disturbance of Macleod Trail pavement
SPRING
GARDENS SNOW DUMP
(at 32nd Avenue N.E.)
500mm casing augered under R/R, stream bed into #1 fairway
of Fox Hollow Golf Course, directly into 5 x 7 storm drain
No disturbance to environment or fairway
HIGHWAY
8 & 85 STREET S.W.
85m of 900mm casing drilled through solid bedrock
WATER
INTAKE TO PUMP STATION
(Cavalier Power Station)
85m of 500mm casing augered from inside casement sunk 14m
deep
BALZAC WATER LINK (Nexen Co. Gen. Plant)
137.5m of 1370mm casing across Deerfoot Trail & Barlow
Trail
DEERFOOT
FEEDERMAIN
47m of 1200mm casing in solid bedrock across Deerfoot Trail
BALZAC
GAS PLANT
Seven
400mm casings augered under H/P gas line and other utilities
98th AVENUE SANITARY SEWER
(City of Calgary)
900mm diameter casing that was 45m long, 9m deep, in rock and
direct to a 1-S manhole
|