Past Earth Works Projects:
2006/07 - Shepard storm water diversion
DIVERSION PHASE 1
The City Of
Calgary
Construction of
headwork structures for the diversion of storm water
including: check structure in the existing main canal,
wasteway structure to the new Shepard Canal, twin duct
underdrain (1800*2400mm) and associated inlet/outlet
structure. Included the excavation of 40,000m3.
Value $ 7,400,000
2006/07 - Shepard Storm
Water Diversion
Diversion Phase 5A
The City Of Calgary
Construction of 9.5km stretch
of new canal including: excavation of 1,300,000 m3,
placement of armour/riprap gravels, installation of 3 twin multiplate structures (3300*5000mm), two twine 3000mm road
crossing structures, access roads and associated structures.
Value: $14,100,000
2006/07
- shepard storm water diversion
DIVERSION PHASE 2A
The City OF
Calgary
Construction of 2.9km of new canal including: the excavation
of 400,000m3, armour gravels, access roads and
associated structures.
Value $ 3,200,000
2006
- highway 22
ALBERTA
TRANSPORTATION - Southern Region
Construction for
widening of 9.0km of the existing Highway 22, which included
320,000m3 of excavation.
Value $2,400,000
2006
- City of lethbridge
REGIONAL LANDFILL EXPANSION
City Of Lethbridge
Expansion of municipal landfill including the installation
of a clay liner with leachate collection and associated
accesses.
Value $ 1,400,000
2005/06 - Secondary A Canal
Rehab.
(Langdon
Reservoir to 12 Mile
(Spillway)
WESTERN IRRIGATION DISTRICT (WID)
Rehabilitation of 4.9 km of existing irrigation canal
including 4 road crossings; 230,000 m3 in
earthworks; installation of cast-in-place spillway
structure.
Value: $2,700,000
2005/06
- Hwy 791 Grade
Widening
(S. of
Hwy 575 to N. of Hwy 581)
ALBERTA
TRANSPORTATION - Southern Region
Widening of 14.6 km of
existing highway; 400,000 m3
of common excavation; superstructure rehabilitation of an
existing bridge over the Rosebud River.
Value $ 3,900,000
2005
- Stoney Trail Detours
(Calgary)
ALBERTA TRANSPORTATION - Southern Region
Construction of Crowchild Trail detour including paving and
streetlighting, construction of Barlow Trail detour;
abutment fills at Nose Creek and at Deerfoot Trail; total
earthwork volumes: 700,000 m3.
Value $ 5,700,000
2005
- Horizon Landfill
(Fort McMurray,
AB)
CANADIAN NATURAL RESOURCES LTD.
Construction of a 35,000
m2 Class 2 Landfill including clay liner and drainage media;
220,000 m3 of grading; construction of associated
roadways, leachate collection systems, fencing &
landscaping.
Value $2,700,000
2002 PIER D APRON EXPANSION
(Calgary
International Airport)
Calgary Airport Authority
Grading construction of storm pond and installation of
1050mm diameter storm sewer Taxiway earthwork including
gravel installation
Installation of subdrain system and electrical ducts
Construction of a clean water system
Value $ 4,900,000
2001 COUNTRY HILLS BLVD. INTERCHANGE
(at Deerfoot Trail)
Alberta Transportation - Southern
Region
Construction of boulevard twinning, new ramps and 2 loops
220,000 m3 of common excavation
Included paving, concrete curb, gutter, & barrier, & 2 precast
concrete retaining walls
Value $ 5,000,000
2001 DEERFOOT TRAIL
EXTENSION (S. of Dunbow Rd. to
S. of Bow River)
Alberta Transportation
-
Southern Region
Constructed 3.0 km of 4-lane divided highway subgrade
2.5 million m3 of common excavation
Installed 4500 m of perforated subdrain
Installed 1.67 km of storm drainage system
Installed 2 multi-plate structures
Value: $7,800,000
2000 DEERFOOT
TRAIL & HWY 22X INTERCHANGE
City of Calgary
Construction of 3 km of highway twinning, including GBC and
asphalt
660,000 m3 of common excavation
Construction of 2.5 km of large diameter storm sewer mains
Horizontal augering
Installation of street lighting and landscaping
Value $ 7,000,000
2000 ST.
MARY SPILLWAY REPLACEMENT
Alberta
Infrastructure
870,000 m3 in earthwork quantities (rock excavation &
blasting)
Construction of 4.0 km of secondary highway
Construction of St. Mary Dam
Demolition and removal of bridge
and spillway
Curtain grouting and shotcrete installation
Value $ 5,250,000
|