Caliber Systems Inc. has the resources to complete heavy civil construction projects on time and on budget.

For estimates or budget requirements on future graging projects, please contact our office at
(403) 250-6622.

Jason Sauve, P. Eng., Project Manager
Cell: (403) 540-5083

Jason Leishman, C.M., Project Manager
Cell: (403) 827-3912

Rob Kost, C.E.T., Project Manager
Cell: (403) 990-2227

Craig Felzien, EIT, Project Manager
Cell: (403) 461-4176

Cody Praud, Estimator/Project Manager
Cell: (403) 461-2237




 

Services:  Horizontal Augering  |  Deep Utilities Installation
Environmental Services  | Earth Works  |  Equipment Rentals


Caliber Systems Inc.'s earthworks group has developed over the past several years from the efficiencies realized in constructing both the deep utilities and earthworks components of large civil projects. From our roots in canal construction, Caliber Systems Inc. has moved on to complete a number of complex highway projects, subdivision site grading, dam construction and pond cleaning. A portion of our work to date includes hourly equipment rentals.

A list of our past clients includes government branches such as Alberta Transportation, Alberta Infrastructure, the City of Calgary, municipalities, smaller towns and irrigation districts in Southern Alberta. We have also completed projects for private land developers and many of the leaders in the local heavy construction industry such as Graham Construction and Engineering Ltd., PCL Construction, Dominion Construction, Ellis Don Construction.

With a record of timely completion of complex projects and a complete fleet of earthworks equipment, Caliber Systems Inc. is ready to begin your next earthworks project.

Past Earth Works Projects:

2006/07 - Shepard storm water diversion
DIVERSION PHASE 1

The City Of Calgary

Construction of headwork structures for the diversion of storm water including: check structure in the existing main canal, wasteway structure to the new Shepard Canal, twin duct underdrain (1800*2400mm) and associated inlet/outlet structure. Included the excavation of 40,000m3.

Value $ 7,400,000
 

2006/07 - Shepard Storm Water Diversion                                                   Diversion Phase 5A

The City Of Calgary

Construction of 9.5km stretch of new canal including: excavation of 1,300,000 m3, placement of armour/riprap gravels, installation of 3 twin multiplate structures (3300*5000mm), two twine 3000mm road crossing structures, access roads and associated structures.

Value: $14,100,000

2006/07 - shepard storm water diversion
DIVERSION PHASE 2A

The City OF Calgary

Construction of 2.9km of new canal including: the excavation of 400,000m3, armour gravels, access roads and associated structures.

Value $ 3,200,000

2006 - highway 22

ALBERTA TRANSPORTATION - Southern Region

Construction for widening of 9.0km of the existing Highway 22, which included 320,000m3 of excavation.

Value $2,400,000

2006 - City of lethbridge
REGIONAL LANDFILL EXPANSION

City Of Lethbridge

Expansion of municipal landfill including the installation of a clay liner with leachate collection and associated accesses.

Value $ 1,400,000

2005/06 - Secondary A Canal Rehab. (Langdon Reservoir to 12 Mile (Spillway)

WESTERN IRRIGATION DISTRICT (WID)

Rehabilitation of 4.9 km of existing irrigation canal including 4 road crossings; 230,000 m3 in earthworks; installation of cast-in-place spillway structure.

Value: $2,700,000


2005/06 - Hwy 791 Grade Widening
(S. of Hwy 575 to N. of Hwy 581)

ALBERTA TRANSPORTATION - Southern Region
 
Widening of 14.6 km of existing highway; 400,000 m3 of common excavation; superstructure rehabilitation of an existing bridge over the Rosebud River.

Value $ 3,900,000
2005 - Stoney Trail Detours
(Calgary)

ALBERTA TRANSPORTATION - Southern Region

Construction of Crowchild Trail detour including paving and streetlighting, construction of Barlow Trail detour; abutment fills at Nose Creek and at Deerfoot Trail; total earthwork volumes: 700,000 m3.

Value $ 5,700,000

2005 - Horizon Landfill
(Fort McMurray, AB)

CANADIAN NATURAL RESOURCES LTD.

Construction of a 35,000 m2 Class 2 Landfill including clay liner and drainage media; 220,000 m3 of grading; construction of associated roadways, leachate collection systems, fencing & landscaping.

Value $2,700,000

2002 PIER D APRON EXPANSION (Calgary International Airport)
Calgary Airport Authority

Grading construction of storm pond and installation of 1050mm diameter storm sewer Taxiway earthwork including gravel installation
Installation of subdrain system and electrical ducts
Construction of a clean water system

Value $ 4,900,000

2001 COUNTRY HILLS BLVD. INTERCHANGE (at Deerfoot Trail)
Alberta Transportation - Southern Region

Construction of boulevard twinning, new ramps and 2 loops
220,000 m3 of common excavation
Included paving, concrete curb, gutter, & barrier, & 2 precast concrete retaining walls

Value $ 5,000,000

2001 DEERFOOT TRAIL EXTENSION (S. of Dunbow Rd. to S. of Bow River)
Alberta Transportation - Southern Region

Constructed 3.0 km of 4-lane divided highway subgrade
2.5 million m3 of common excavation
Installed 4500 m of perforated subdrain
Installed 1.67 km of storm drainage system
Installed 2 multi-plate structures

Value: $7,800,000

2000 DEERFOOT TRAIL & HWY 22X INTERCHANGE
City of Calgary

Construction of 3 km of highway twinning, including GBC and asphalt
660,000 m3 of common excavation
Construction of 2.5 km of large diameter storm sewer mains
Horizontal augering
Installation of street lighting and landscaping

Value $ 7,000,000

2000 ST. MARY SPILLWAY REPLACEMENT
Alberta Infrastructure

870,000 m3 in earthwork quantities (rock excavation & blasting)
Construction of 4.0 km of secondary highway
Construction of St. Mary Dam
Demolition and removal of bridge and spillway
Curtain grouting and shotcrete installation

Value $ 5,250,000

 

CURRENT & RECENT PROJECTS:

2007/08 - Highway 1 And 9
INTERCHANGE

Construction of abutments, ramps with associated service roads including wetland construction and culverts. Total excavation of 1,800,000 m3.
Value: $16,000,000

2007/08 - Policeman Flats Restoration
RESTORATION AFTER 2005 FLOODS
 

Construction of vegetated gabion basket infiltration gallery along the bow with riprap protection berm, access road parking area, CSP and boat launch.
Value: $1,900,000

2007 - Highway 519
HIGHWAY 519 WEST OF INTERSECTION WITH HIGHWAY 23

Grade widening, base paving of 8.7 km of highway 519 including CSP installation and fencing installation.
Value: $5,800,000

2007 - Highway 8 and 22
ROUND ABOUT

Construction of a traffic circle at the intersection of highway 8 and 22 including culverts and future expansion ramps.
Value: $1,900,000

2007 - Town of Three Hills
LAGOON UPGRADES

Construction of 800, 000 m3 sewage lagoon with: 800 m of sewer line with control and over flow manholes, access roads, culverts and swale. Included the excavation of 650,000 m3.
Value: $5,500,000
 

 


 